Attach Ac Indicators

An air conditioning gauge locate has two gauges and three lines. One of the gauges is for the high side, the other for the low side. Everyone gauge has a hose --- the grand side is bloodshot and the low side is dispirited. The third hose, which is between the two, is normally unprincipled. This is the hose that attaches to the bottle of Freon. Assemble undeniable all the dials on the gauges are closed before attaching them.


Instructions


1. Set the grand side edge in the vehicle. This is the smaller wrinkle, and it has a claret cap on the Schrader valve.


2. Remove the bloodshot cap.3. Allot the low side line in the vehicle. This is the larger of the two lines and has a woebegone or melanoid cap on the Schrader valve.


Ally the hose for the high side of the gauges over the Schrader valve on the aerial side borderline. Lift up on the round connector, and push the hose onto the string. Let the connector snap into compass. Insure that the hose is firmly connected to the edge.


4. Remove the cap. Affiliate the hose for the low side of the gauges over the Shrader valve on the low side line. Lift up on the round connector. Push the hose onto the line. Allow the connector to snap into place. Ensure that the hose is firmly connected to the line.


5. Make sure the valve is closed on the Freon bottle. Connect the yellow line to the Freon bottle.