Not too long ago, the bathroom looked like this.
The bathroom stayed like this for months and months while other things got worked on. A lot has been accomplished. Just not in the bathroom. :-) Around Mid-October we decided we could use a bit of help on the bathroom, seeing as it is the only full bath in the house, and brought in a contractor to help things along. After all these months we kept things in the spirit of our design board, though there have been a few changes along the way.
Now it looks a wee bit better. Walking in from the hallway.
Peeking at the double vanity to the left.
Here is a look at the double vanity with the subway tile, restoration hardware lights, floating vanity and vessel sinks.
Turning around 180 degrees, is the separate room with the toilet and tub. We ran slate tile up the front of the tub, and used slate inside the niches. We used a different shower curtain from the one in the design board as the pattern just didn't work in the space.
Even the toilet looks good, and so far I'm pretty impressed with it's performance. :-)
This weekend was full of 12 hour days caulking (thanks Momnipotent!), painting (the color is Behr Breaker), installing vanity lights, sealing grout, mounting fixtures and tons of other miscellaneous stuff. But it's all worth it. We stand in the bathroom now and are still surprised that this is our house. But it is, even if we have to pinch ourselves every so often to remind us we aren't dreaming.